Skip to content
  • Our Services
  • Our Projects
    • Mechanical
    • Steel Structures
    • Piping
    • Concrete
    • Timber
  • About Us
Menu
  • Our Services
  • Our Projects
    • Mechanical
    • Steel Structures
    • Piping
    • Concrete
    • Timber
  • About Us
  • English
  • Türkçe

Day: 21 May 2020

Çanakkale Çan Thermal Power Plant Boilers No. 1 and 2 Renovation Works Comparison Studies

As Enprotek Engineering, we carried out benchmarking studies within the scope of the renovation works of boilers No. 1 and No. 2 in Çanakkale Çan Thermal Power Plant. This study aimed to increase the efficiency and safety of the power plant.

For more information and any queries about our services, please contact us.

Linkedin Twitter
Quick Links
  • MainPage
  • About Us
  • Downloads
  • Privacy Policy
  • MainPage
  • About Us
  • Downloads
  • Privacy Policy
Contact
  • E-Mail: contact@enprotek.com.tr
  • Phone: +90 850 532 532 0
  • Phone: +90 312 426 33 37
  • Phone: +90 312 426 33 38

2025 © All Rights Reserved. Enprotek Engineering Co. Ltd.