Baku Drinking Water Project Water Tanks

As Enprotek Engineering, we have successfully completed the calculation and project design works of two 500 m³ capacity water tanks within the scope of Baku Drinking Water Project. This project was carried out in order to strengthen the drinking water infrastructure of Baku and increase the water storage capacity.

Project Details

  • Transmission Line Water Tanks (2×500 m³): Within the framework of the Baku Drinking Water Project, the design and engineering calculations of two water tanks, each with a capacity of 500 m³, were carried out. These tanks were optimized to ensure safe and efficient storage and distribution of water.

Completed Works

  • Detailed Technical Drawings: All technical drawings of the water tanks have been created. These drawings were prepared to guide the construction and assembly processes.
  • Engineering Calculations: All necessary engineering calculations were meticulously made to ensure the safety and durability of the tanks.
  • Material Selection: Appropriate materials were selected and used to make the warehouses long-lasting and hygienic.
  • Project Management and Coordination: Effective management and coordination was ensured throughout the project, ensuring that the works were completed on time and within budget.
  • Quality Control and Assurance: Quality control processes were meticulously managed at all stages, ensuring that the project complies with high quality standards.

Baku Drinking Water Project is an important project that allows Enprotek Engineering to showcase our expertise and engineering skills in water storage solutions. By keeping customer satisfaction at the highest level in this project, we continue to offer solutions that are fully suitable for Baku’s drinking water infrastructure.

Paylaş:

Diğer İşlerimiz

Bizimle İletişime Geçin

We are glad to have you with us as we celebrate our 10th anniversary.

10th Year