Çanakkale Çan Thermal Power Plant Boilers No. 1 and 2 Renovation Works Comparison Studies

As Enprotek Engineering, we carried out benchmarking studies within the scope of the renovation works of boilers No. 1 and No. 2 in Çanakkale Çan Thermal Power Plant. This study aimed to increase the efficiency and safety of the power plant.

Project Details

  • Boiler Renewal Works: Mechanical compatibility was checked during the renewal of fluidized bed boilers. In this process, it was aimed to ensure harmony between the mechanical systems of the old and new boilers and to realize the renewal process smoothly.

Completed works

  • Mechanical Compatibility Check: During the refurbishment, detailed checks were carried out to ensure the mechanical compatibility of the new boilers with the existing systems. This was a critical step to improve the overall performance and safety of the plant.
  • Physical Checks: The physical fit of the old and new boilers was checked to ensure that the refurbishment process was carried out in accordance with technical requirements. These checks were important for the correct installation and integration of the boilers.
  • Quality Control and Assurance: Quality control processes were meticulously managed throughout the project, ensuring that the refurbishment works complied with high quality standards.

Çanakkale Çan Thermal Power Plant Boilers No. 1 and No. 2 Renewal Works Comparison Studies is an important project that allows Enprotek Engineering to showcase our engineering expertise and innovative solutions. Keeping customer satisfaction at the highest level, we continue to offer solutions that are exactly tailored to the requirements of the project.