Pipelines were designed in order to make the wastes accumulated in the septic wells located within Erdemir convenient for operation by eliminating the need for vacuum trucks, creating measurement facilities, etc. and to ensure controllability from the determined centers.
The pipelines connecting 42 pumping stations to the Treatment Plant, totaling more than 18 km, were designed to be compatible with existing structures and lines. In addition, approximately 85 m long steel pipe bridge and foundation projects for the pipe bridge on the treatment plant side, which is the collection point, and reinforced concrete projects of the collection ponds planned to be built at the pumping stations were prepared.