Yozgat Drinking Water Treatment Plant Project Pumping Station 3 Structure

As Enprotek Engineering, we have successfully completed the design of the reinforced concrete pumping station within the scope of Yozgat WWTP Project. This project was carried out to ensure effective management of wastewater in the region.

Project Details

  • Reinforced Concrete Pumping Station: Within the framework of Yozgat WWTP Project, a reinforced concrete pumping station was designed and engineered. This center was optimized to increase efficiency in wastewater collection and transfer processes.

Completed Works

  • Detailed Technical Drawings: All technical drawings of the pumping station have been created. These drawings were prepared to guide the construction and assembly processes.
  • Engineering Calculations: All necessary engineering calculations were meticulously made to ensure the safety and durability of the pumping station.
  • Material Selection: Appropriate materials were selected and used to ensure the longevity and durability of the center.
  • Project Management and Coordination: Effective management and coordination was ensured throughout the project, ensuring that the works were completed on time and within budget.
  • Quality Control and Assurance: Quality control processes were meticulously managed at all stages, ensuring that the project complies with high quality standards.

Yozgat WWTP Project is an important project that allows Enprotek Engineering to showcase our expertise and engineering skills in wastewater management. By keeping customer satisfaction at the highest level in this project, we continue to offer solutions that fully meet the needs of Yozgat province.

Paylaş:

Diğer İşlerimiz

Bizimle İletişime Geçin

We are glad to have you with us as we celebrate our 10th anniversary.

10th Year